The Montags-Check
Where your work waits and why. In 2 to 6 weeks.
For organisations where everyone is busy and the work still takes too long. We measure where it waits, find the cause in the organisation, the workflow or IT, and put a target design in front of you.
Implementation is not part of it. You commission it separately afterwards, if you want.
Rather talk first? The intro call is free and takes 30 to 60 minutes, in person in Hamburg or Munich if you prefer.
Lead time from 20 days to 5, measured across the entire value stream (Energy). Read the full case
How the check works
Four steps, as in every one of our projects
- 1
Measure
We measure where the work waits: how long it lies, how often it is handed over and what each station spends its time on. Afterwards it is clear where the bottleneck sits.
- 2
Find the cause
We lay the org chart, the process map and the system landscape on top of each other. Where ownership and system boundaries do not match, we look for the cause.
- 3
Exploit
We check what can be got out of the bottleneck without rebuilding anything, and try it out. We record what it brought.
- 4
Decide
You get a decision paper: leave the bottleneck where it is and use it fully, or elevate it. With options and costs.
After that come steps 3 and 4 of how we work, changing things together and staying until it runs, as a separate assignment. How we work →
Result
What you have in hand afterwards
- Baseline report: the measurement at the start. You measure every later change against it.
- Conway map: org chart, process map and system landscape on top of each other, with the places where ownership and system do not match.
- Bottleneck diagnosis: where the bottleneck sits, what keeps it there and in which layer the cause lies.
- Exploit log: what we tried at the bottleneck without rebuilding anything, and what it brought.
- Decision paper: the options with their costs.
- Exit criterion: The check is done when the decision paper is ready and you can decide without us how to go on.
In a picture
What the Conway map makes visible
Prerequisites
What we need from you
- Access to case or ticket data (Jira, ServiceNow, ERP workflow or similar)
- the current org chart
- an overview of the system landscape
- one contact each from the business, the workflow and IT
- a sponsor from the management board or division management
Frame
Duration, team, price
Duration
2 to 6 weeks, depending on size.
Team
Always with IT depth. The same people look through all three layers, in the same week.
Price
Fixed price by size, from €12,000 plus VAT. The size is set by the number of teams and systems in the value stream under review.
References
An example
From 20 days to 5
EnergyThe bottleneck: the approvals. Every configuration waited for several departments that had to sign off one after another.
The cause: an agile operating model in which the approvals had stayed in the old line organisation. (organisation)
Our solution: We reviewed the operating model, removed the approvals that slowed things down, streamlined the end-to-end process with BPMN and Lean, and cleaned up the portfolio.
Key result
Lead time from 20 days to 5. It has stayed there ever since.

Where does your work wait?
Tell us briefly what it is about. Then we tell you how big the check will be for you.
Request the Montags-Check